中文
Seapoe Global Relocations (Netherlands)
Seapoe Global Relocations (Netherlands)
Shipping & Moving between Netherlands and China

Amsterdam Furniture Move-In Size Checklist

The doorways of old Dutch houses are usually a good deal narrower than the sofa a Chinese buyer has just measured. What decides whether a three-seater sofa or a 1.8 m mattress can get inside is not its nominal dimensions, but the smallest clear opening among five points: the entry door, the elevator car, the stairwell corner, the interior doors, and the windows. Size checks must be completed before ordering and packing; discovering the problem only after the goods reach the Port of Rotterdam costs far more to fix than switching models. Once door-to-door delivery gets stuck at the doorway, it often means rebooking, a second delivery attempt, or even a last-minute switch to a crane hoist, and neither the cost nor the waiting time is covered by the original quote.

Below is a walk-through of the process for a client shipping furniture from Shanghai to Amsterdam: order placed in March 2026, warehousing and packing in April, arrival and delivery in June. The rules unfold step by step, and the differences for sofas, mattresses, pianos, appliances, and porcelain are explained where they arise. For the Netherlands, customs clearance can be applied for duty-free treatment with scanned copies of a passport and long-term visa, which is the precondition most immigrant clients rely on for this route; but the duty-free eligibility applies to used personal household goods, so new furniture must have tags and manuals removed and be declared as used items.

Measure five points first: entry door, elevator, stairwell, interior doors, windows

Each of the five locations is measured differently, and recording only the width is not enough.

  • Entry door: measure the clear width (the actual passage width with the door leaf open, excluding the frame and handle), the clear height, and the threshold height. Entry doors in the Netherlands commonly have a clear width of around 80 cm, and some older buildings are narrower. Threshold height is easily overlooked, and it reduces the usable clear height by a few centimeters.
  • Elevator: measure the car's interior width, interior depth, door clear width, and door clear height. Also record the car's diagonal, since that is the number that lets a long sofa in at an angle. The interior height must be measured too, as a mattress pushed in upright is limited by this dimension.
  • Stairwell: measure the clear stair width, the minimum passage at the landing corner, and the distance from handrail to wall. Stairs in old Amsterdam buildings are narrow and steep, and the corner landing is often the tightest spot; a protruding handrail further reduces the passage width.
  • Interior doors: the clear width of each room's doorway, especially the bedroom and living room the sofa or mattress ultimately needs to enter. Interior doors are usually narrower than the entry door, so don't conclude based on the front door alone.
  • Windows: window opening clear width, clear height, and sill height. When the door route fails, hoisting in through a window is the fallback, but the window opening dimensions determine whether this option is viable at all; the sill height determines whether the item can be swung smoothly into the room after being lifted.

Also record whether a truck can stop downstairs and the carrying distance from the entrance to the elevator. If the truck cannot get close or the corridor is too long, extra carrying and second-delivery charges will apply. Destinations such as Singapore set explicit preconditions for free upstairs delivery (truck can reach downstairs, an elevator is available, goods fit in a hand truck, and the apartment building allows trucks in); the Netherlands has no equivalent clause, but the logic is the same: if any of these four conditions is not met, it can turn into an on-site surcharge.

How to read the non-detachable dimensions of sofas and mattresses

Nominal dimensions are the product's exterior dimensions, not its passage dimensions. To judge whether it can get in, read three numbers:

  1. The longest side of non-detachable components: the integral frame, the one-piece seat cushion, the mattress body — these parts that cannot be taken apart set the limit.
  2. The largest piece after detachable parts are removed: if sofa legs, armrests, or backrests can be removed, calculate by the largest remaining piece. Under Seapoe's operating standards, simple bed frames with eight or fewer screws, dining table legs, and sofa feet are disassembled and reassembled at no extra charge; anything beyond that is billed separately. Reassembly charges at destination vary by country, and for the Netherlands it is advisable to confirm at signing whether simple reassembly is included.
  3. Dimensions after packing: outer packaging increases an item's volume by about 20% over its net volume, and wooden crates add the board thickness on top of that. Checking doorways against packed dimensions is the only way to avoid the situation where "it fits bare but won't fit once the packaging is off."

A 2 m three-seater sofa, with legs and backrest removed, may drop to a practical passage height of around 70 cm; but if the one-piece seat cushion is 1.9 m long, that cushion is the non-detachable limiting piece. Mattresses are usually completely non-detachable: a 1.8 x 2 m mattress passing through an 80 cm doorway can only go in upright or through a window. Spring mattresses can flex slightly under pressure to pass through, while latex and coir mattresses have essentially no flex allowance — the same 1.8 m label can mean very different practical difficulty.

ItemDetachable partsNon-detachable limiting pieceKey check
Fabric/solid wood sofaSofa legs, backrest, some armrestsIntegral frame, seat cushionCompare the longest side of the largest piece after disassembly with the door's clear height
MattressNoneThe whole mattressHeight needed to pass upright, whether a window route is possible; spring types flex slightly, latex/coir types do not
Modular wardrobeWhole unit can be broken down into panelsIndividual side panelWhether a single panel exceeds the stairwell corner
PianoLegs and lid onlyPiano bodyCustom wooden crate required; check against crate outer dimensions
Sintered stone/glass cabinet doorsUsually non-detachableThe whole panelFull corner protection required; check against thickened dimensions

Three ways to handle oversize items: disassembly, hoisting, switching models

Once the size check is stuck, there are only three paths, listed from lowest to highest cost.

Disassembly: take it apart as far as needed to get through. Remove sofa legs, break down bed frames, split wardrobes into modules. Disassembly costs are usually lower than the loss from replacing an entire furniture set over a few centimeters' difference. Note that reassembly at destination is charged separately, varies widely by country, and for the Netherlands it is advisable to confirm in the contract whether simple reassembly is included.

Hoisting: used when neither the door nor the stairwell works but the window opening is large enough. Three things must be confirmed in advance: the window opening's clear dimensions, whether a hoisting work area can be set up downstairs, and whether the property management permits it. Hoisting is priced separately based on site conditions and is weather-dependent, so schedule buffer time. Before hoisting, also confirm insurance coverage — door-to-door insurance covers damage throughout the journey, but hoisting is a special operation, and whether damage from abnormal stress falls within the claims scope should be confirmed in writing with the carrier at the time of order.

Switching models: give up the oversize model before ordering and choose one that is knock-down or more compact. This is the lowest-cost option, but it only works before shipment.

Pianos do not follow the usual logic of the first two options: an upright piano needs a custom wooden crate, and the doorway and stairwell are checked against the crate's outer dimensions; a grand piano is larger and heavier, requires professional manpower to move, and overweight handling fees apply. Piano insurance usually provides total loss cover only; partial damage such as dents and knocks is generally not covered, and this must be clear before deciding on hoisting.

Appliances with built-in batteries (such as Dyson vacuums and cordless floor washers) are classified as dangerous goods and are prohibited from sea freight; they fall outside the scope of dimension discussions and must be removed in advance. Robot vacuums and similar items can be assessed for shipping only after the battery is removed and the unit cleaned.

Wooden frame and corner protector thickness to confirm before packing

Packaging is designed for transport, not for getting through doorways. Wooden crates and corner protectors increase exterior dimensions, so doorway checks must use the packed dimensions.

Packaging itemSpecification requirementImpact on getting in
Crate materialFumigation-free plywood/three-ply board; raw wood is not permittedRaw wood packaging requires mandatory fumigation, from RMB 750 per shipment
Crate structureHinged with openable latches; 10 cm forklift feet reserved at the bottomForklift feet add about 10 cm in height
Wooden frameAbout RMB 230 per cubic meterAdds several centimeters to exterior dimensions; must be removed if it catches at the edge
Corner protectors and pearl foamFull wrap for fragile items such as sintered stone and glass cabinet doorsAdds thickness at edges and corners; check against thickened dimensions

Cartons weighing over 50 kg per piece must be reinforced with woven bags, otherwise they must be palletized or crated; over 150 kg incurs domestic forklift fees; over 68 kg in pallet or crate packaging incurs foreign forklift fees at the destination port. These specifications are assessed per piece by the carrier during warehousing and packing, and clients should provide the maximum weight and longest side per piece at the quotation stage to avoid charges added only after arrival at the warehouse.

Porcelain, marble countertops, and similar items: Seapoe carries marble but does not insure it, and porcelain is fragile and handled on a "loss covered, damage not covered" basis. The packed dimensions of such items are often closer to the doorway limit than furniture, so they cannot be overlooked in the check. Fragile items' packaging must also account for customs inspection scenarios — customs conducts physical inspections of incoming goods, and overly complex packaging makes on-site repacking harder; the hinged latch design of the crates is precisely to facilitate opening and inspection.

Division of work on delivery day: inspection and placement

Delivery-day work falls into two parts: inspection and placement.

Inspection is completed before signing. Focus on checking the packaging exterior for damage, dampness, and deformation, and whether the piece count matches the packing list. If outer packaging damage is found, photograph it on the spot and note it before deciding whether to open the package. Unpacking inspection is carried out jointly by the delivery staff and the recipient, and damaged items should be kept in their original packaging for claims. Door-to-door insurance covers damage throughout the journey at a rate of 3.5% of the total declared value, with a USD 100 deductible and a minimum premium of USD 150; without insurance, the compensation cap for loss is RMB 200 per carton. It is important to distinguish that the basic sea freight insurance included free with some orders covers total loss only and is not the same coverage as door-to-door insurance.

The boundaries of the placement stage should be clarified in advance: door-to-door service includes delivery into the home, unpacking of large items, and removal of packaging waste and debris, but it does not equal full furniture assembly. New furniture assembly is charged separately in most destinations; for goods declared as used personal household items in the Netherlands, packaging waste is usually disposed of by the recipient according to local regulations. If the apartment has no elevator or a truck cannot stop, this must be stated at the time of order, otherwise second-delivery fees may apply.

For walk-up buildings on high floors without elevators, confirm at the quotation stage whether stair carrying is included in the delivery fee.

Actions you can take before departure

One week before ordering, measure each of the five points with a tape measure, write the smallest values on a sheet of paper, and send them together with the non-detachable dimensions of the sofa and mattress you like to the carrier for checking. At the same time, confirm three things: the maximum weight and longest side per piece, whether simple reassembly is included, and whether a truck can stop at the destination address.

Arrange ordering and warehousing 2-3 months in advance to leave margin for consolidation, fumigation (if required), and sailing schedules. Sea freight to the Netherlands typically takes 6-12 weeks overall, and routing via the Cape of Good Hope can stretch it to about 3 months; the current sailing schedule prevails. Pricing is by volume: minimum charge from 2 cubic meters for Eindhoven, 4 cubic meters for Utrecht and The Hague, with starting costs usually in the range of several thousand to about RMB 10,000, and the excess accumulating at over RMB 2,000 per cubic meter, subject to real-time quotes; quotes fluctuate with fuel and space availability and are not locked in.

Numbers you can check against directly:

  • When the doorway clear width is under 80 cm, the sofa seat cushion's long side should be kept within 1.9 m or a knock-down model chosen
  • Crate forklift feet take up 10 cm in height; crate outer dimensions are estimated as contents plus board thickness
  • Reserve forklift feet for pieces >= 30 kg; woven bags for cartons >= 50 kg; domestic forklift fees apply above 150 kg; foreign forklift fees apply above 68 kg for pallets/crates
  • Packed volume is billed at about 20% above net volume
  • Weight limit is 200 kg per cubic meter; overweight is billed separately
  • A single side of 1.1-1.99 m incurs a small oversize fee, 2-2.99 m a large oversize fee, and over 3 m must switch to the sea-truck channel
  • Fumigation for solid wood or raw wood packaging from RMB 750 per shipment
  • Door-to-door insurance 3.5%, USD 100 deductible, minimum premium USD 150
  • Free storage at the domestic warehouse for 30 days; returning clients may apply for an extension to 60 days

Quick answers to common questions

The doorway is 80 cm — can a 1.8 m mattress get in? Yes, but it must go in upright, and you must confirm the clear height at the stairwell corner is enough for the mattress once stood on end. Latex and coir mattresses cannot flex and are harder to pass than spring mattresses; if the corner is too tight, consider the window route first.

What if the sofa still won't fit after the legs are removed? First confirm whether the largest piece after disassembly is still the seat cushion or the frame; if the cushion is non-detachable, it is the limiting piece. If the limiting piece still exceeds the doorway, only hoisting or switching models remain.

How are carrying fees calculated for an old building with no elevator? Confirm at the quotation stage whether stair carrying is included in the delivery fee; high-floor carrying not declared in advance may be billed on site.

The goods have arrived at port and only then we find they won't fit — can it still be salvaged? Yes, but at the highest cost: delivery must be rebooked and hoisting feasibility assessed, and hoisting is subject to weather and property management approval. This is exactly why size checks must come first.

Free Quote

● If you have WeChat installed on your device, you may Click to contact us on Wechat

● You may also submit the form below, and we will contact you shortly (items marked with * are required).

Departure*:
Destination*:
Goods:*
Vol./Weight:
Notes:
Name:
Phone*:
Email:
@2026 Seapoe Relo (Netherlands)
沪ICP备15036454号